Padiham Grid Substation GT1 Replacement
Maintaining the highest safety standards while working around live electrical infrastructure was critical. Close coordination with SP ENW and completing works under safety standby ensured safe systems of work, controlled access and continuous operation of the site throughout construction.
Challenges we worked through

Maintaining the highest safety standards while working around live electrical infrastructure was critical. Close coordination with SP ENW and completing works under safety standby ensured safe systems of work, controlled access and continuous operation of the site throughout construction.

The project involved extensive excavation in areas containing numerous live underground cables and services. Comprehensive CAT scanning, careful excavation techniques and constant liaison with the client's engineering team allowed works to progress safely without service disruption. Due to positions of existing services when uncovered, liaison with design engineers was critical to allow safe construction while maintaining and protecting cables.

SP ENW always required unrestricted access for maintenance teams during construction. Careful planning of temporary fencing, vehicle routes and phased construction ensured operational access remained available throughout the project.

Large excavations for transformer bunds presented challenges due to perched groundwater. Temporary pumping systems and phased excavation works enabled construction to continue while maintaining safe and dry working conditions.

The project required close coordination between civil works, structural steel installation and SP ENW electrical installation teams. Detailed planning and regular communication ensured each stage was completed in sequence, keeping the overall programme on track.
One Team, Full Delivery
Working closely with SP ENW, our team established the construction compound, working area & temporary works while ensuring safe access was maintained for operational staff within the live Grid Substation. We worked with SP ENW to adjust our programme & utilise resources efficiently to ensure timely completion in line with clients programme.
Existing transformer plinths, redundant cable trenches & obsolete reinforced concrete structures were carefully demolished & removed. All works were completed under strict safety controls due to the live electrical environment.
Following excavation works, our team constructed the new reinforced concrete transformer bund, auxiliary bund & over forty equipment foundations. Every element was delivered to engineering tolerances to support future steelwork & electrical infrastructure.
Specialist cable troughs, HV duct routes, drainage systems & earthing excavations were completed, allowing SP ENW to undertake the installation of new electrical equipment with minimal disruption.
The final phase included construction of new access roads, drainage channels, lighting installations, reinstatement works & final landscaping before handing the completed project back to the client.