New Build Porsche Car Showroom, Preston

Client: Warden Construction Ltd
New Build Porsche Car Showroom, Preston
Completed in line with agreed client programme of  Works
Contract Value £1.5m
Repeat Contract From A Valued Client
Prestigious Development Creating Jobs Within The Community
Pile cropping and construction of reinforced pile caps and ground beams Steel fixing in pile caps, ground beams and ground floor slab Heavily reinforced ground floor concrete slab with power float finish Various formwork systems Supply and installation of gas membrane and waterproofing system New FW and SW installations Attenuation tank and petrol interceptor installations Installation of new services infrastructure and ducting works Hard landscaping package Surfacing and macadam works

What Works We Completed

Pile cropping and construction of reinforced pile caps and ground beams
Steel fixing in pile caps, ground beams and ground floor slab
Heavily reinforced ground floor concrete slab with power float finish
Various formwork systems
Supply and installation of gas membrane and waterproofing system
New FW and SW installations
Attenuation tank and petrol interceptor installations
Installation of new services infrastructure and ducting works
Hard landscaping package
Surfacing and macadam works

One Team, Full Delivery

Foundations completed ahead of programme ready for the steel frame to be erected

Foundations Completed Ahead of Schedule

GF slab constructed and finished to specified and tight tolerances

Precision Ground Floor Slab

Over 40 tonnes of cut and bent reinforcement used on the project

Extensive Steel Reinforcement Works

Specialist workshop equipment installed below ground floor slab for vehicle inspection works including all associated foundation and formwork requirements

Specialist Vehicle Inspection Facilities

Large attenuation tank supplied and installed including all associated civil engineering and groundwork requirements

Attenuation Tank Installation

Extensive hard landscaping package completed in line with agreed completion and handover date

Timely Hard Landscaping Completion

Car parks and access roads constructed and finished to a very high standard

Quality Parking and Roads
Foundations Completed Ahead of Schedule Precision Ground Floor Slab Extensive Steel Reinforcement Works Specialist Vehicle Inspection Facilities Attenuation Tank Installation Timely Hard Landscaping Completion Quality Parking and Roads
Phase 01

What Works We Completed

There was a large existing brick drainage culvert that ran through the proposed site and this had to be avoided at all times with any heavy plant, equipment and machinery to ensure the culvert did not sustain any damage. An exclusion zone was implemented and adhered too to avoid putting any unnecessary loading onto the culvert.

Phase 02

What Works We Completed

There was hazardous material identified and present in the existing ground due to the lands former use. This was excavated and stockpiled separately to all other waste and taken to a licenced tipping facility in Middlesborough who specialised in dealing with hazardous materials.